Case Studies
Stormwater, flood and civil projects approved across NSW councils.
Search Service:
Flood Controls Ruled Out – New Dwelling, Ku-ring-gai
Ku-ring-gai Council · Residential, New Dwelling
Council asked for a flood study before it would sign off on a low-lying CDC dwelling backing onto a watercourse. Our hydrology and 2D flood modelling showed flood controls didn't apply to the site, saving the client a fortune in design and construction. Approved.
OSD reduced by 30% — Dual Occupancy, Northern Beaches
Northern Beaches Council · Dual occupancy ·
Council's charts called for more detention than the site could hold. Site-specific DRAINS modelling cut the required volume by 30%. Approved.
Overland Flow & OSD — New Dwelling, Inner West
Inner West Council · New Dwelling
Council's pre-DA advice would have cut the floor plan back for an open flow channel. We argued it down, then swapped the OSD for a rainwater tank. Approved
Rainwater Reuse Sizing — New Dwelling, City of Sydney
City of Sydney · New Dwelling
No council or BASIX requirement, so the tank size was the client's call. We modelled a year of wet and dry days to get it right. Approved.
Disclaimer: Illustrative renders are AI-generated. Engineering outcomes and real details are described in the approved projects.