More Floor Space, No Flood Model – Alterations & Additions, Ku-ring-gai
Ku-ring-gai Council · Residential, Alterations & Additions
Council's stormwater controls capped how much of the site could be built on, and the client didn't want to pay for flood modelling. We worked back from council policy to give the architect a clear limit, raised it with a charged line system, and had the flood risk management report accepted without a model. Approved.
Flood & Stormwater Without Modelling: Alterations & Additions, Randwick
Randwick City Council · Alterations & Additions
The client wanted to avoid the cost of flood modelling and a new stormwater system. We worked with the architect to keep the design within the council’s flood controls, and a hydraulic check showed the existing drainage could stay. Approved.
Water quality on a constrained site - hotel alterations & additions, Ballina Shire Council
Ballina Shire Council · Commercial (Hotel)
New parking triggered Council’s water quality controls, but tight headroom and the existing buildings left no room for a single treatment device. We split the treatment into several smaller measures that met Council’s targets and fitted around the existing buildings. Approved.
OSD Avoided - Dual Occupancy, Sutherland Shire
Sutherland Shire Council · Dual occupancy
Tight dual occupancy lot with a basement pump-out. We compared pre- and post-development impervious areas, showed the increase was minor, and removed the need for OSD. Approved.
OSD reduced by 30% — Dual Occupancy, Northern Beaches
Northern Beaches Council · Dual occupancy ·
Council's charts called for more detention than the site could hold. Site-specific DRAINS modelling cut the required volume by 30%. Approved.
Expert Witness & Custom OSD — Warehouse, Willoughby
Willoughby City Council · Industrial ·
Tight headroom, discharge and water quality targets unmet, and a matter heading to conciliation. A custom two-chamber tank and expert evidence settled it. Approved.
Four-Lot Subdivision Drainage — Northern Beaches
Northern Beaches Council · Subdivision
Four lots all needing gravity drainage, almost no room for detention, and the neighbour's kerb sitting on private land. Approved.
Stormwater & OSD on a heritage site — commercial building, Ku-ring-gai
Ku-ring-gai Council · Commercial
A heritage cottage, a partially low-lying site and almost no headroom for a tank. The answer was two drainage systems rather than one. Approved.
Water Quality & Detention — Bus Depot, Singleton
Singleton Council · Industrial ·
Water quality treatment and on-site detention delivered without a single tank. The parking area does the storing.
Approved.
Road Widening & Stormwater — 10 Multi-Dwelling Homes, Lake Macquarie
Lake Macquarie City Council · Multi-Dwelling
Council required a road widening but wouldn't say how far it extended — and part of the existing road sat on private land. Approved.
Driveway & Access Design — Commercial, Central Coast
Central Coast Council · Commercial
Ten parking spaces on a site that barely fits them — and grades steep enough to drain without vehicles bottoming out on the way in. Approved.
Vehicle Access on a Regional Road — Alterations, Ku-ring-gai
Ku-ring-gai Council · Alterations & additions
A regional road frontage demands a turning bay. A narrow site leaves nowhere to put one. B85 modelling found the smallest that worked. Approved.
Change of Use — Stormwater, Flood & Public Domain, Inner West
Inner West Council · Change of use
Wall-to-wall boundaries with nowhere to run pipes, a basement surrounded by floodwater, and a driveway that had to become a footpath. Approved.
Overland Flow & OSD — New Dwelling, Inner West
Inner West Council · New Dwelling
Council's pre-DA advice would have cut the floor plan back for an open flow channel. We argued it down, then swapped the OSD for a rainwater tank. Approved
Rainwater Reuse Sizing — New Dwelling, City of Sydney
City of Sydney · New Dwelling
No council or BASIX requirement, so the tank size was the client's call. We modelled a year of wet and dry days to get it right. Approved.