Case Studies

Stormwater, flood and civil projects approved across NSW councils.

Search Service:

Flood Stuart steinle-davies Flood Stuart steinle-davies

Flood Controls Ruled Out – New Dwelling, Ku-ring-gai

Ku-ring-gai Council · Residential, New Dwelling

Council asked for a flood study before it would sign off on a low-lying CDC dwelling backing onto a watercourse. Our hydrology and 2D flood modelling showed flood controls didn't apply to the site, saving the client a fortune in design and construction. Approved.

Read More
Stormwater, Flood Stuart steinle-davies Stormwater, Flood Stuart steinle-davies

More Floor Space, No Flood Model – Alterations & Additions, Ku-ring-gai

Ku-ring-gai Council · Residential, Alterations & Additions

Council's stormwater controls capped how much of the site could be built on, and the client didn't want to pay for flood modelling. We worked back from council policy to give the architect a clear limit, raised it with a charged line system, and had the flood risk management report accepted without a model. Approved.

Read More

Disclaimer: Illustrative renders are AI-generated. Engineering outcomes and real details are described in the approved projects.