Erosion & Sediment Control Plans
The core drawing set councils ask for at DA, CDC or CC. We design the whole system, not just the pipes.
What you receive
Erosion and Sediment Control Plan for small sites
Soil and Water Management Plan for large sites
Sediment basin design and sizing
Construction staging notes and standard details
How we do it
Measures selected and detailed to Landcom's Managing Urban Stormwater: Soils and Construction — the Blue Book
Site-specific rather than generic: sediment fences, stabilised access, diversion drains, kerb inlet protection and dust control located where they actually work
Temporary sediment basin sizing for larger disturbed areas
Staged control measures matched to the construction program
Coordination with the civil and stormwater design so permanent works serve as temporary controls where possible
When you need it
At Construction Certificate or CDC stage on almost all sites. Larger, steeper and subdivision sites, and sites near a watercourse, generally require a full Soil and Water Management Plan.
Related services Stormwater Management Plans · Driveway Access
Frequently Asked Questions
-
Councils increasingly reject generic plans. Ours are drawn to the site.
-
Generally, on larger disturbed areas, or where the Blue Book thresholds are triggered. We confirm against your site area and soil type.
-
On small sites, often yes