Hydrology Assessment & Catchment Modelling

Every stormwater and flood design starts with one question: how much water arrives, and when. We model it properly rather than assuming.

What you receive

  • Hydrology report with catchment plan

  • Peak flow estimates for pre- and post-development scenarios

  • Pipe and pit network capacity assessment

  • Hydraulic Grade Line analysis

  • Detention and discharge sizing inputs

How we do it

  • Catchment modelling in DRAINS (Watercom)

  • ARR 2019 rainfall data, temporal patterns and areal reduction factors

  • Contributing catchment delineation from LiDAR, survey and council drainage plans

  • Existing stormwater system capacity checks — where council's pipes are already full, we say so early

  • Pre- versus post-development flow comparison

  • Outputs carried directly into detention, WSUD and flood models

When you need it

Supporting an OSD design, sizing a drainage network, assessing whether council's downstream system can take your discharge, or establishing inflows for a flood model. Standard for subdivision, multi-unit, commercial and industrial developments.

Frequently Asked Questions