No Easement, No Problem – New Dwelling, Hunters Hill

Council — Hunters Hill Council

Development — Residential, New Dwelling

Services — Stormwater management plan · On-Site Detention (OSD) · Stormwater Diversions & Easements · Water Sensitive Urban Design · Driveway & Access Design · Hydrology Assessment

Year — 2026

Outcome — Approved

Background

The owner planned to build a new house on the peninsula of Hunters Hill, including changes to the driveway access.

The problem

The site falls away from the street, so stormwater would normally drain through the downstream neighbour's land. The neighbour refused to grant a drainage easement. With the kerb higher than the front of the lot, there was no easy way to drain to the street by gravity. On top of that, the existing crossover grades didn't meet Australian Standards.

Our solution

We designed a custom pit raised above street level and a pump system to lift stormwater from the on-site detention up to the pit. We added a rainwater tank so the design met council's water sensitive urban design requirements, which also gives the owner water to reuse around the house.

For the driveway, we reviewed the vertical clearances along the existing profile and provided an alternative design that meets the prescribed grades, so cars won't scrape on the way in or out.

Was it approved? yes.

On-Site Detention Detail

Driveway Long-section