Case Studies
Stormwater, flood and civil projects approved across NSW councils.
Search Service:
More Floor Space, No Flood Model – Alterations & Additions, Ku-ring-gai
Ku-ring-gai Council · Residential, Alterations & Additions
Council's stormwater controls capped how much of the site could be built on, and the client didn't want to pay for flood modelling. We worked back from council policy to give the architect a clear limit, raised it with a charged line system, and had the flood risk management report accepted without a model. Approved.
Flood & Stormwater Without Modelling: Alterations & Additions, Randwick
Randwick City Council · Alterations & Additions
The client wanted to avoid the cost of flood modelling and a new stormwater system. We worked with the architect to keep the design within the council’s flood controls, and a hydraulic check showed the existing drainage could stay. Approved.
Water quality on a constrained site - hotel alterations & additions, Ballina Shire Council
Ballina Shire Council · Commercial (Hotel)
New parking triggered Council’s water quality controls, but tight headroom and the existing buildings left no room for a single treatment device. We split the treatment into several smaller measures that met Council’s targets and fitted around the existing buildings. Approved.
Stormwater & OSD on a heritage site — commercial building, Ku-ring-gai
Ku-ring-gai Council · Commercial
A heritage cottage, a partially low-lying site and almost no headroom for a tank. The answer was two drainage systems rather than one. Approved.
Overland Flow Assessment — Single Dwelling, Mosman
Mosman Council · Alterations & additions
The site sits low in its catchment and floods in large storms. The question was whether street-level extensions could be built at all. Approved.
Vehicle Access on a Regional Road — Alterations, Ku-ring-gai
Ku-ring-gai Council · Alterations & additions
A regional road frontage demands a turning bay. A narrow site leaves nowhere to put one. B85 modelling found the smallest that worked. Approved.
Change of Use — Stormwater, Flood & Public Domain, Inner West
Inner West Council · Change of use
Wall-to-wall boundaries with nowhere to run pipes, a basement surrounded by floodwater, and a driveway that had to become a footpath. Approved.
Disclaimer: Illustrative renders are AI-generated. Engineering outcomes and real details are described in the approved projects.